GEPCO New Connection Online Application
If you’re living in Gujranwala and wish to apply for a new connection from GEPCO, you can easily do so by completing an e-application form and submitting it. Just fill out the form and let GEPCO ENC (Electricity New Connection) take care of the rest. The relevant department at GEPCO promptly begins the application process upon form submission.
Feeling overwhelmed by the application process? No need to worry! GEPCO’s online billing system will manage it efficiently and promptly. The online service for new connections eliminates the need to visit the GEPCO office and wait in long lines. Simply apply from the comfort of your home, and the online application process allows you to monitor your application status online.
Application for GEPCO New Electricity Meter Connection
To begin the online application process for a new connection, you must access the ENC (Electricity New Connection) system or the dedicated online application portal. The application form for a new connection from GEPCO is divided into 5 steps, each with its sub-sections. It is important to fill out all the mandatory fields accurately and thoroughly. Ensure to provide valid and genuine information, as incomplete or inaccurate details may result in your application being rejected. Before submitting your application, make sure you have the required documents on hand:
Attention!
Please note that all the documents mentioned above should be provided in both print and as softcopies in either JPG or PDF formats.
GEPCO New Connection Application Form Download
You can access the GEPCO application form for download here. We will go over 5 steps individually in a brief manner.
It is a more convenient option to fill out and submit a new connection application form from a desktop or laptop.
Sub Division information
Attention!
If you’ve already installed an electricity connection then there is no need to provide a neighbor’s reference number.
GEPCO New Connection Process
Step 1- Begin by accessing the ENC online application portal on your desktop or laptop.
Step 2- Find the “apply” button on the homepage and give it a click.
Step 3- Input the reference number of your neighbor into the designated field. Once entered, the form will automatically populate other fields such as the neighbor’s Name and Address, the name of the distribution company, as well as the corresponding sub-division name and code.
Step 4- Next, you will need to specify your load type in the provided tab. Choose from the options provided based on your requirements. For example, for a domestic connection, select 5 KW, while for industrial and commercial connections, a load above 5 KW will be required.
Step 5- Finally, select your connection type in this section. Opt for the Domestic type for residential connections, while options for Agricultural and Industrial are available for commercial connections.
Step 6- If you live in a rented house and are applying for a new connection, select “Tenant”. If you own the house, select “Landlord”.
Step7- Fill in your full name with accurate spelling in the first box, and your father/husband’s name in the second box.
Step 8- Choose your citizenship in the next box, selecting the first option if you are Pakistani. Then, write your CNIC number and address.
Step 9- In the mobile numbers section, enter your personal mobile number in field 1, and your father/husband’s mobile number in the second field.
Step 10- Enter the contact details of the person applying for the new connection. If it is you, select the same as above and the fields will be automatically filled in with the information.
Step 11- Here you will need to provide information about the premises. If you have already installed an electricity meter, please indicate here, otherwise select “0”.
Step 12- In the following field, you will be asked to specify the load requirement for a new electricity connection. Choose your preferred load and provide the address where you wish to install the new meter.
Step 13- In this section, you must indicate the number of appliances in use at your residence. For example, if you have one air conditioner, enter “AC” in the field and choose the quantity in the next tab. Once you have specified the quantity, input the load consumed by the electric appliances. Continue adding other appliances by selecting “Add Row”.
Step 14- After completing the form, the next step is to upload all the scanned copies mentioned above by clicking on the browse button.
Step 15- Review the entire application form and terms and conditions for GEPCO’s new connection request form before clicking the “I Agree” button.
To complete the form submission, activate the captcha and enter numbers in the designated field, then click the “Submit” button.
After submitting the online new connection application, we can move on to the next step.
How to Check GEPCO New Meter Connection Status
Once you apply for a new connection, you will receive a tracking number to monitor the status of your GEPCO application.
Step 1- Click on the button below to visit ENC (Electricity New Connection).
Step2- Click on the “Track” button located on the left side of the page. A form will pop up with two options available.
Step3- Next, select the first option if you want to track a new connection application, or choose the second option if you are monitoring a change in name/tariff/load application.
Step4- After choosing the “new connection” application type, input the distribution company’s name and the tracking ID. If you are getting a GEPCO new connection, pick GEPCO from the drop-down list.
Step5- Once you have selected the company, enter the tracking number that was provided to you during the online application submission process.
After entering all the necessary information, the screen will show you the status of your application and the important details of your request.
GEPCO Demand Notice
Once you submit a new connection application, the GEPCO ENC team will carefully examine the entire application process until completion. The ENC team will oversee essential aspects such as the length of the service line, conductors, and any other necessary equipment required for the installation of the new meter connection. Following a thorough assessment, a demand notice will be issued.
You will be able to track the status of your application, which will display either “Review completed” or “Pay Demand Notice Fee.” At this point, you can download your demand notice voucher through the ENC portal.
How to Apply GEPCO Demand Notice Online
Note- To speed up the application process, pay the demand notice fee at your nearest bank.
How to Submit Demand Notice Online
Once you have paid the new connection fee to GEPCO, you can complete an online application for a demand notice. To proceed with your application, you will need to have a scanned copy of the paid demand notice.
Here are the steps to follow on the ENC portal:
Step 1- Go to the ENC portal.
Step 2- Select the “upload DN” option as shown in the image.
Step 3- Specify the application type as a new connection.
Step 4- Enter your tracking number and click on submit.
Step 5- A window will appear requesting you to upload the scanned copy of the demand notice. Upload the file and save it. This will submit your demand notice to GEPCO management.
Note: If you make a timely payment and upload the demand notice on the ENC portal, your new connection will be installed within 15 days as per the official procedure.
GEPCO New Connection Demand Notice Fee
The fee for a new connection from GEPCO varies depending on factors like the type of connection. Once GEPCO receives the form and necessary documents, they will provide a registration PIN. This PIN is then used to track the progress of meter installation. The application will be reviewed and approved based on the guidelines outlined in the Distribution Code, Consumer Eligibility Criteria, and Grid Code.
GEPCO Contact Numbers
If you are a client of GEPCO, you can use the contact number provided by GEPCO to address and report any electricity-related concerns promptly. The GEPCO team is trained to handle a variety of issues, such as billing problems and policy questions. A dedicated department has been set up by GEPCO to specifically address consumer emergencies. The GEPCO customer service team is available around the clock and will ensure that consumers are connected to a customer care representative without delay.
Listed below are the helpline numbers for various subdivisions under GEPCO.
Conclusion
GEPCO’s new connection service can assist consumers in getting a new connection set up through the proper procedures. The GEPCO demand notice requires specific essential details, such as a CNIC/passport, to monitor service expenses. Once consumers make the requested payment outlined in the GEPCO demand notice and the necessary officers confirm the payment, the installation process will commence at the consumer’s location.
GEPCO will conduct a wiring assessment and have the consumer sign an electricity contract to initiate the process. Once the Demand notice fee has been verified, consumers can track the progress of their electrical installation through GEPCO’s new connection tracking system. By utilizing the GEPCO helpline, consumers can verify the current status of their GEPCO connection